Origis Energy’s Lockport Storage Project is designed to efficiently connect to the grid by being located adjacent to a utility substation (shown here in orange).

​

Operating on a minimal project footprint, less than a quarter of the land (shown here in blue) within the project boundary will be used for the facility, with most of the area left untouched.

Screenshot 2025-09-08 at 1.48.31 PM.png

Away from the Falls

The project site, located on private property outside of Lockport, was chosen to avoid the Falls, a cherished ecological landmark and energy contribution that defines the region.

 

The entire project is located over 20 miles away from the Niagara Falls.

Screenshot 2025-09-08 at 12.43.57 PM.png

New York State’s Energy Goals

Contributing to the state’s 2030 standard

In the state of New York, the development of battery storage is being driven by a standard set in 2024, to add 6 gigawatts of energy storage by 2030.

 

With an addition of this size, batteries would be able to provide nearly 20% of the state’s energy during peak use times.